Robotic welding, material handling, and vision-inspection systems — designed, integrated, and supported by the same team, end to end.
Whether speccing a greenfield line or diagnosing a down cell, start here.
Speccing automation for a new or expanding component manufacturing line.
An existing cell or automated station is underperforming, bottlenecked, or down.
Manual or semi-automated stations ready for robotic welding or handling upgrades.
Keep an existing installed automation cell running reliably with OEM parts and SLAs.
Standard payloads, repeatability tolerances, and control platforms supported.
| Capability | Typical Application | Payload / Reach | Cycle Accuracy |
|---|---|---|---|
| Robotic MIG/TIG Welding Cells | Structural fabrication, automotive chassis, brackets | 6 – 20 kg | ±0.1 mm |
| Vision-Guided Pick & Place | Part sorting, orientation, kitting, machine tending | up to 15 kg | ±0.2 mm |
| PLC / HMI Retrofit | Legacy semi-auto line upgrade & control sync | — | — |
| AMC & Spares Support | Any installed cell, any major robot brand (Kuka, Fanuc, ABB) | — | — |
A 3-shift auto-component fabricator was losing ~6 hrs/week to manual weld rework. Kovai RoboWorks retrofitted 2 existing manual stations with vision-guided robotic welding cells over a 5-week install, cutting rework to under 45 min/week and freeing 2 operators for inspection duty.
Describe your cell, cycle time constraint, or planned automation line.